Piling works entailed the installation of 112 No. 450mm diameter sectional flight auger piles founding between 12m -23m depth. We selected to use our Klemm KR708-2 due to the depth of gravel and the selected pile installation methodology.
The site was complicated by poor access beneath the retained existing building. Access was limited to 2.8m headroom by 2.3m width. The piles were formed using